The William Bacon Oliver Lock and Dam Hydroelectric Project (FERC No. 13005) is located in Tuscaloosa, Alabama at the existing William Bacon Oliver Lock and Dam. The proposed 11.72-MW project would operate in run-of-river mode using flows from the Black Warrior River. Riverbank filed a PAD for the project with the Federal Energy Regulatory Commission on May 20, 2011. After completing several engineering and environmental studies to better determine project impacts, a Final License Application was filed on December 14, 2011.
William Bacon Oliver Pre-Application Document
William Bacon Oliver Draft License Application, Exhibits A, B, C, D and E
William Bacon Oliver Final License Application, Exhibits A, B, C, D and E